Specifications include, but are not limited to: The New Single Terminal and Parking at KCI project consists of a 1.1 Million square foot terminal facility including curbside, ticketing lobby, TSA compliant security screening checkpoint, TSA compliant in-line Checked Baggage Inspection System and associated support areas, baggage claim areas, baggage make-up area and associated support functions. The facility will include secure concourses providing concessions and customer amenities. The facility will initially support 39 aircraft gates, but facility systems are designed to ultimately support 42 gates. Equipment to support air carrier operations in the terminal, including passenger boarding bridges, aircraft support systems (e.g., pre-conditioned air, ground power, potable water, etc.), communications infrastructure, common use communications system for City-controlled gates, information display systems (e.g., flight information display systems, baggage information display systems, etc.), inbound and outbound baggage handling systems, and applicable tenant finishes are included in the scope. Aircraft parking aprons and gates are designed for Group III category aircraft, with several gates capable of handling larger Group V aircraft. Twenty-Five (25) Remain overnight (RON) aircraft parking positions are provided in proximity to the New Terminal. The non-movement area, including new deicing operation, will be monitored and controlled by virtual ramp control operation, supported by a network of cameras. Fourteen (14) deicing pads and associated collection system are included.