Specifications include, but are not limited to: COURTHOLDINGROOMA(22’x25.6’):Ceiling fans are to be taken out and replaced with new lighting and ceiling tile. Ceiling tile is 2x2 squares and 2x2 LED lighting. Must have a setting for dimmable. A Judges Bench must be created with three levels (one being at ground level). Floor level witness stands, must meet ADA guidelines and wheelchair accessible.The second tier will be 6 inches higher than ground level for the clerks,with built in desks. The third tier will be 6 inches higher than the second tier for the Judge. There needs to be 3 feet behind the Judge and then 2 feet in front for the counter. Outlets need to be on Tier 2 and 3 for the clerks and the Judge. The railing height is to be 36” –38” for the bench. Chair rail level wainscoting on walls; walls are roughly 8 feet 2 inches tall. 2x2 squares on the floor, color is to be determined by the Judges. (2) 5x3 tables in front of the Judges’ Bench.Electrical outlets must be at each work station, and test existing outlets. 42” flat screen TV with a swivel mountExisting cabinets and fridge need to be removed and installed in Room 302; in Room 302 a sink also needs to be installed. Existing TV and table (30x5) is to be removed from room and destinations are TBA.Above Judge’s Bench needs to be coffered ceiling with can LEDlighting.ROOM B(room right off the Courtholding Room)A wall is to go straight across the room; making 2 separate offices. Carpet is to match the Courtholding Room; 2x2 squares and color to be determined by the judges.Repaint and Repair walls, paint color is to remain the same. Vinyl coating is currently covering the plaster walls