Specifications include, but are not limited to: Remove and replace two (2) high voltage junction boxes and all internal box components; Remove and replace all internal components of one (1) stainless steel high voltage junction box or replace the stainless steel junction box and all internal box components, Contractor’s option; Clean existing Pumps No. 4 and No. 5 electrical raceways between junction boxes and exterior of the Pump and Blower building; Remove and replace flexible connectors between three (3) high voltage junction boxes and rigid conduit; Remove and replace entire length of wiring from the junction boxes to the Motor Control Center in the Pump and Blower Building. No splices below grade; Furnish and install one (1) new 120V outdoor GFI duplex receptacle in the vicinity of the large junction boxes, furnish and install new 120V junction box, furnish and install new conduit and wire to new receptacle from 120V Clarifier No. 3 alarm light circuit;