Specifications include, but are not limited to: The scope of this repair should include removal of the motor** and entire pump from the wet well. Once removed, all column sections and the discharge head are to be stripped to bare metal and Coal Tar Epoxied inside and out. The impellers will be dynamically balanced and new case rings will be furnished and installed for both impeller bowls. All bushings, bearings, enclosing tubes, shafts and stainless steel hardware will be inspected for wear and reused whenever possible. Any part that is not considered reusable is to be furnished and installed by the winning bidder. After all repairs are complete, the pump and motor will be re-installed and the pump operation will be tested with MSD staff present.