Specifications include, but are not limited to: Evaluate current configuration and determine if there would be any concerns with installing a water recirculation system. This will include the current lakes on site that the splash pad currently drains into. Evaluate current water pressure to design pressure and correct over pressurization issues. Lake levels and water quality as well as aquatic environment shall be evaluated if a change were made to a recirculation system Determine cost estimates for an above ground or below ground tank and control room including construction, maintenance, chemicals, and required training. Design a system that is aesthetically pleasing in a park environment, while having minimal impact to the surrounding play areas. Prepare construction documents and specifications for bidding. Assist County in construction bidding, selection of contractors, construction administration and observation. Provide commissioning of system to verify flow rates and proper water treatments