Loading...
Skip to main content
< Back to results

Pet Adoption Center Engineering and Installation of Two Make-Up Air Units


Location
Missouri
Publication Date
06/11/2018 08:17 AM EDT
Closing Date
06/29/2018 11:00 AM EDT
Issuing Organization
County of St. Charles
Solicitation Number
Description

Specifications include, but are not limited to:. St. Charles County is seeking bids for Pet Adoption Center Engineering and Installation of Make-Up Air Units. . St. Charles County Government Facilities Management Department is seeking bids for the engineering and installation of 2 make-up air units for the Pet Adoption Center. The area of work is Kennel A and B, both kennels are of the same size measuring 90 feet wide, and 20 feet deep with a ceiling height of 14 feet, making the volume of space 25,200 cubic feet. The Vendor must itemize cost for engineering of system performing 10 air changes per hour, the equipment cost and installation for system performing 10 air changes per hour. The cost deducts for 8 and 6.5 air change per hour. The Contractor shall provide a cost for doing the install in 2 phases as well as estimated annual energy usage for each air change criteria with and without an energy recovery wheel.

Source
http://www.sccmo.org/bids.aspx?bidID=685 (opens in a new window)

Get instant access

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Group

Matching bid notifications from participating agencies

Basic

Access participating agency bids