Specifications include, but are not limited to: NEW INSTALL – Trail Extension at New Melle Lakes, Robert Ridge Trail Connection at Veterans Tribute Park, Timothy Ridge Trail Connection at Veterans Tribute Park A. Excavate and replace base materials in areas with a minimum of six (6”) inches compacted base rock and to a 10’ width. B. Subgrade shall be prepared and compacted in accordance with Section 02200 – Subgrade Preparation. C. Once the appropriate compaction is achieved, a minimum of four (4”) inches of Compacted Type C Mix Asphalt shall be installed in two (2) separate two (2”) inch lifts and Eight (8’) feet in width. Centered on the subgrade so that each side of the subgrade is equally exposed. D. Asphalt trails should also have a 4’ radius installed on each side of trail where connected to a existing asphalt path way. NEW INSTALL - Maintenance area parking lot at Veterans Tribute Park A. Re grade existing rock parking area, lowering the rock six (6”) inches along the front of the maintenance building B. Subgrade shall be prepared and compacted in accordance with Section 02200 – Subgrade Preparation. C. Once the appropriate subgrade compaction is achieved, a minimum of four (4”) inches of Compacted Type B Mix Asphalt shall be installed. D. Once the appropriate Type B Mix Asphalt compaction is achieved, a minimum of two (2”) inches of compacted Type C Mix asphalt surface shall be installed.