Specifications include, but are not limited to: Supply all equipment, materials, and labor to provide board-up services on the basement and first floor windows and doors that are not secure at old Cleveland. A. Contractor shall comply in all respects with any and all applicable federal, state, and local codes, laws, regulations, and ordinances. Any fees required for permits or inspections shall be paid for by the contractor at no additional cost to the Owner. B. Contractor shall provide and install 26 gage corrugated metal or 1/2” OSB over all basement and first floor windows and doors that are not secure at old Cleveland. a. Please provide separate cost for corrugated metal and 1/2” OSB. C. Contractor shall remove any debris from the site in a timely manner or pose any hazard to residents. Scrap must be picked up daily and placed in a contractor provided dumpster or other container. All scrap from the demolition and the installation must be disposed of properly. D. Contractor must cleanup site each day and after the job is complete.