Specifications include, but are not limited to: 1. This scope of work includes sanitary sewer construction and shall consist of furnishing all labor, materials, and equipment for the complete installation of sewers and appurtenances. 2. 3. Includes saw cutting, trenching and installing new sanitary sewer lines to connect to MSD. 4. Includes conforming to ALL requirements of “Authorities Having Jurisdiction” at no additional cost to the Owner (St Louis County). This includes: a. Saw cutting requirements b. Excavating code requirements c. Backfill material requirements d. Excess disposals requirements e. Enclosing / securing trench openings (ie. Concrete, Asphalt etc.) 5. Trace wire: A mainline trace wire must be installed, with all service lateral trace wires properly connected to the mainline trace wire, to ensure full tracing/locating capabilities from a single connection point. 6. Work area shall be cleaned of all debris at the end of each workday.