Specifications include, but are not limited to: The rehabilitation and replacement of sewer mains, service lateral connections, and manholes. Work generally includes pre-construction cleaning and CCTV inspection of sewer mains and service laterals scheduled for rehabilitation, open cut point repairs of sewer mains (~ 83), CIPP lining of sewer mains (~ 30,336 l.f.), open cut replacement of service lateral connections (~ 230), CIPP lining of service lateral connections (~ 54), post-construction CCTV inspection of rehabilitated sewer mains and service laterals, total line replacement of sewer main segments (~ 17,500 l.f.), installation of new manholes (~ 15), cementitious lining of existing manholes (~ 612 v.f.), replacement of manhole frames and covers (~ 94), rebuilding manhole benches and troughs, and surface restoration.