Specifications include, but are not limited to: • Approximately 2,000 SF • Design Assist services will be required for MEP/FP systems only. See attached schematic design drawing. • Prepare and submit design drawings for authority having jurisdiction (AHJ) review and approval to obtain a permit. • Building will be occupied in surrounding areas so precautions will need to be taken prior to work starting on site. • Demolition of existing rooms. • Create service windows to interact with the public by various department, a computer testing lab, and consultation space. • Relocate the current break area. • Relocate vending machines. • Modify public bathrooms for touch-free features. • Modify current transaction windows to minimize air exchange between public and staff. • Replace a security gate with storefront doors and incorporate security door controls. • This scope will need to be completed by Mid-October to allow for the Owner to prepare for year-end services.