Specifications include, but are not limited to: 2.6.1 The contractor shall deliver and fully install the exhaust hood and additional equipment at MECC in accordance with the manufacturer’s recommended installation procedures to the full satisfaction and acceptance of the Department. 2.6.2 The contractor must furnish all related equipment, materials, and supplies needed for complete installation of the exhaust hood and additional equipment. 2.6.3 The contractor shall coordinate the work schedule with the Department designee for minimal disruption to normal state business occurring at the same time. a. Working hours shall be Monday – Friday, 8:00 a.m. through 4:00 p.m. b. The contractor shall cleanup and remove debris accumulated during the installation from the premises 2.6.4 Once installed, the contractor must test the equipment and make all necessary adjustments required for successful operation at no additional cost to the Department. 2.6.5 Contractor shall repair roof as needed for installation of exhaust hood. Contractor shall supply all materials and labor needed for repairs to roof for exhaust hood installation.