Specifications include, but are not limited to: This project includes the following major scope elements: • Resurfacing • ADA improvements • Intelligent Transportation System (ITS) advanced detection, including conduit, wire, pull boxes and controller cards, will be installed at the intersection with Rue St. Jean. A Pan, Tilt, Zoom (PTZ) camera with mast arm extension and associated wire will be installed at the intersection of New Florissant Road and Washington Street to monitor traffic flow and pedestrian and bicycle movements along the corridor. Specific consultant scope items include: • Section 106 Documentation and Application • Threatened and Endangered Species Documentation and Application • Preliminary Plans • Right-of-Way Plans • Final Plans • Job Special Provisions • Construction Estimates • Coordination with the Missouri Department of Transportation (MoDOT) • Coordination with the Metropolitan Sewer District (MSD) • Pavement Borings and Design (if necessary) • Utility Coordination (if necessary) • Miscellaneous Pick-Up Survey Work (as necessary) • Roadway Design • Traffic Signal Design