Specifications include, but are not limited to: The contractor should deliver and install the equipment within thirty (30) calendar days ARO or on a date requested by the Department. The contractor shall disconnect the existing equipment (Air Star 30); remove it from the FCC site and dispose of it. The contractor shall not be paid additionally or separately for de-installation, removal, and disposal. The contractor shall not be responsible for patching or painting surfaces as a result of disconnection of the existing equipment and installation of the new equipment; however, the contractor must leave the work-site in broom-clean condition, disposing of excess materials and debris consistent with good industry practices and in accordance with local, state and federal rules, laws, etc. -Oil Free -Minimum number of simultaneous users = 3 -Two heads -Minimum Tank Size = 12 gallons -Minimum Total HP = 1.5 -Voltage (Min/Max) = 220/250 -Must include sound covers -All other appurtenances necessary for installation and operation -BRAND REFERENCE: Airstar AS30 or equivalent