Specifications include, but are not limited to: The project involves the removal and replacement of the Meramec Bottom Road Bridge No. 509 over Lemay Creek, located 0.20 miles west of Interstate 55. Anticipated required elements include, but are not limited to: Hydraulics & FEMA No-Rise Certification Geotechnical Analysis & Design Structural Analysis & Design Roadway Design Construction Phasing Drainage and Water Quality Design (as necessary) Miscellaneous Pick-Up Survey Work (as necessary) Right-of-Way Plans Preliminary Plans Final Plans Job Special Provisions Construction Estimates Coordination with the Missouri Department of Transportation (MoDOT) Drainage Design and MSD Permitting (if necessary) Utility Coordination