Specifications include, but are not limited to: Drainage improvements on Bauer Road, west of Tesson Ferry Road (Missouri Route 21). Two small culverts near 10064 Bauer Road are creating significant drainage issues. The project will involve replacement of the two culverts, possibly realigning or relocating each to mitigate ponding on the roadway and impacts to the downstream properties. Specific consultant scope items include: • Hydraulic Study (including any supplemental surveys necessary) • Right-of-Way Plans • Final Plans • Job Special Provisions • Construction Estimates • Coordination with Metropolitan Sewer District (MSD) • Roadway Design • Drainage and Water Quality Design • Culvert Design • Retaining Wall Design (if necessary) • Guardrail Design (if necessary)