Specifications include, but are not limited to: Spring 2020 Production – The Man From Earth: Labor: Tech Week: • March 13-19 Equipment: • Audio: o Eight (8) Wireless Mics o One (1) Digital Mixing Rack o Two (2) QSCK-12 Speakers o Two (2) Subs o One (1) 400 Watt Monitor • Lighting: o Ten (10) LED Leko’s o Two (2) MAC 101 o Two (2) Spot o One (1) Lighting Control Console Summer 2020 Production – The Curious Incident of Dog in the Night: Labor: • Load In: o June 15th - 25th • Tech Week: o July 11th – 15th • Production Schedule: o July 17-19, 24-26 • Strike: o July 26/27 Equipment: • Audio: o QSC on stands with sub o Behringer X32 Digital Console with Stage Boxes o Wireless Sennhesier Rack o AA Batteries o Twenty (20) wireless microphones • Lighting: o SR LED Par Can o Source 4 ETC Lustr+ LED Leko o Chamsys MQ80 Lighting Console o Martin Mac 301 LED Wash o ROSCO florescent paint (1 gallon) o 1-gallon satin black paint • Labor o Day Rate – two (2) Techs to set up o Day Rate – two (2) Techs to strike o Tech week labor: eight (8) hours per day times (x) 5 days o Show days: four (4) hours per day times (x) 6 show days