The bid packet is for the purchase of: (Bid each Rotor Separately) ROTOR #1 - REPAIRS • Remove from ditch. • Remove fins from tube, clean and inspect for reuse, replace as needed. • Remove flanges from tube, clean and machine as needed for reuse. • Check shafts for trueness. • New 50HP Electric motor. • New Baldor Dodge Reducer, Bushing Assembly, Motor Mount Assembly and Standard Motor Mount Belt Guard. • Sandblast tube, flanges and deflector plates • Prime and paint tube, flanges and deflector plates with 2-part paint with hardener • Replace (Rexnord) pillow block bearings • Replace seals • Replace belts. • Reinstall at facility. • If shafts, tubes, or fins and flanges need to be replaced include in bid ROTOR #3 – TOTAL REBUILD • Remove from ditch. • Remove fins from tube, clean and inspect for reuse, replace as needed. • Remove flanges from tube, clean and machine as needed for reuse. • Replace shafts. • New 50HP Electric motor. • New Baldor Dodge Reducer, Bushing Assembly, Motor Mount Assembly and Standard Motor Mount Belt Guard. • New tube. • Drill and tap for studs to mount fins. • Replace deflector plates. • Sandblast tube, flanges and deflector plates • Prime and paint tube, flanges and deflector plates with 2-part paint with hardener • Replace (Rexnord) pillow block bearings • Replace seals • Replace belts. • Reinstall at facility • If new fins or flanges are need include in the bid