Description(s) of Work: ENGINEERING II OVERHAUL TERMINAL AND PACKAGE UNITS, BLDG. 503 (“Project A”): Provide all labor, materials, equipment, tools, transportation, insurance, and services for the project which will overhaul seven (7) air handlers, replace seven (7) hydronic heating coils, and add moisture trapping filters. Work is to include associated ductwork, VFD's, and controls. UCSB LIBRARY CHILLER PLANT REPLACEMENT, BLDG. 525 (“Project B”): Provide all labor, materials, equipment, tools, transportation, insurance, and services for the demo of the existing chiller, cooling tower and pumps, provide two new 600 TR centrifugal chillers, associated cooling towers, condenser pumps and VFD's, piping for chilled, condenser and industrial water, control valves and associated HVAC controls, electrical panel board, power all equipment, testing, adjusting, balancing and commissioning, provide new exhaust fan, modify refrigerant monitor system.