A. Provide the following equipment or equals, approved in advance by the Architect/Owner. 1. Stainless steel pumping modular with 530 cat pump, 5HP, 1 phase motor, 2-way suction diverter valve for cold wash, cold rinse, and freeze control valves. No discharge diverter valves. Unit to deliver 5 g.p.m. @ 1500 p.s.i min. Low voltage controls. 2. Stainless steel holding tanks with float. 3. Wash equipment includes 2 - stainless-steel high-pressure wand booms, one on each side of wash bay, wall mounted. Provide 16' x 3/8" wand hose, trigger wand and wand holster. 4. Two 10-gallon stainless steel automatic mixing tanks with #507 Hydrominder installed. 5. Freeze protection system-single thermostat control with valves. Valve opens with power failure. Includes control unit and thermostat. 6. Foam brush system complete with foam generator and stainless-steel boom system for foam brush hose and brush. 7. Flexible wand holder, 24’’*8” stainless steel wall protector, 4 – stainless steel mat holders, 8 position stainless steel rotary switch with control wire mounted behind finished walls, and auto shutoff timer must be included. 8. All fasteners and support brackets must be stainless steel. 9. The contractor will be required to make the final electrical connections to our disconnect, install ½’’ conduct and low volt wire for the 8-position controller, final connections for the hot and cold supply lines, and final connections for the ½’’ airline.