The Work includes, but is not limited to, the following: 1. Demolition of building structure 2. Demolition & Removal of building foundation 3. Removal and capping of on-site utility connections 4. Removal and proper disposal of all debris 5. Grading and Seeding of all disturbed areas 6. Schedule and Coordinate all necessary inspections. 7. Contractor shall coordinate with all utilities prior to the work starting, including contacting underground locator services, ensuring that all power has been disconnected. 8. Include all temporary utility fees and permits. 9. Provide digital photographs of the predemolition, demolition, and post demolition site (see Article IV Progress of Work / Submittals (F) for specifics) 10. Provide clean up associated with the contractors work. 11. Provide all traffic control as required throughout the demolition process. 12. Provide temporary construction fencing around site.