a. EROSION CONTROL i. The Contractor shall provide the temporary erosion control in accordance with the specifications. This includes construction entrances, silt fence, ditch checks, and dust control, etc. ii. The contractor shall provide the proposed erosion control in accordance with the specifications. This includes seeding. b. CLEARING AND GRUBBING i. The Contractor shall clear and grub the site as required for the proposed construction in accordance with the plans and specifications. The wood chips and tree stumps shall be removed as part of the clearing and grubbing. Organic material left from the tree clearing and generated from grubbing shall be disposed of onsite to a location designated by the Port representative. c. SITE PREPARATION FOR TRACK CONSTRUCTION i. The Contractor shall perform all of the site grading and subballast placement required for the proposed BNSF connection/turnout pad and industry tracks in accordance with the plans and specifications. d. CONSTRUCTION ACCESS i. Maintain and restore construction access to equal or better conditions prior to construction in accordance with the plans and specifications.