The construction of a new restroom building, sidewalk, trail, retaining walls, landscaping, and bioretention basin, including utility installation and grading to enhance the user experiences of the Queeny Park Playground at 550 Weidman Road, Manchester, Missouri 63011. PHASE 1 Site Work 1 Demolition 2 New Work (concrete sidewalk, asphalt, block walls, curb) 3 Site Utilities (stormwater piping, bioretention basin) 4 Grading 5 Seed/Straw 6 Erosion Control 7 Concrete (footings, slab on grade, reinforcing) 8 Phase 1 Subtotal 0.0 PHASE 2 Site Work 9 Concrete (concrete plaza, sidewalk, cut and patch existing) 10 Utilities (storm, sanitary, water) Building 11 Concrete 12 Masonry 13 Metals 14 Wood & Plastics 15 Thermal & Moisture Protection (Sealant, Roof, Insulation) 16 Doors/Window/Glazing (Doors and louvers) 17 Finishes 18 Specialties (sanitary wall panel, toilet accessories) 19 Plumbing 20 HVAC 21 Electrical 22 Landscape