Specifications include, but are not limited to: The demolition Scope of Work to remove the existing Metal Classroom Building is approximately 37,000 SF, and the interior renovation Scope of Work is approximately 16,000 SF with the building additions Scope of Work at approximately 33,400 SF. The building addition Scope of Work involves the construction of concrete masonry unit (CMU) with brick veneer exterior walls, interior concrete masonry unit (CMU) walls and metal stud framed walls with gypsum board partitions, concrete slabs, flooring, ceilings, interior and exterior painting, manufactured casework, visual display boards, doors and frames, toilet partitions and toilet accessories, light fixtures, Variable Refrigerant Flow (VRF) with dedicated Outside Air System (DOAS), and plumbing fixtures.