This project consists of mechanical rehabilitation ofLift Station 30-05 and relocation ofthe existing gravitysewermain. The demolition of the existing featuresincluding removalof pumps, piping, base elbows, guide rails, and floats fromthe wet well; removal of piping, check valves and gate valves from the valve vault. New improvementsinclude installation of pumps, base elbows, guide rails, piping, floats, and associated parts in the wet well; installation of piping, check valves and plug valves in the valve vault. Relocation of the existing gravity sewer main includes abandonment of the existing manholes and removal ofsite improvements as indicated on the plans. Improvements include construction of 8- inch and I 0-inch SOR 35 gravity sewer main, manholes, pavement repair and site restoration. The any other items described in the project manual or inferable there from