Interior 1. Inspect all flange bolts and replace or tighten as needed. 2. Realign seams as needed. 3. Re-caulk all seams with Sikaflex or 3M400 or equivalent. 4. Prepare interior of slide for Gel Coat. 5. Gel Coat to be applied at a thickness of 18 - 24 mils. 6. Isophthalic Maxguard Premium Gel Coat or equivalent is to be used; 7. Apply a non-skid finish at start tub. 8. The contractor shall have a project coordinator as an employee to oversee the ntire project. The scheduling of work in progress inspections with city building officials shall be the responsibility of the project coordinator. 9. Contractor shall furnish all labor, materials and service necessary to complete the projects. Exterior; 1. Power wash exterior of slide with cleaner; 2. Prime - coat as needed. 3. Paint exterior with Poly - Siloxane Paint or equivalent. INSTALLATION; 1. Site preparation shall be done by the contractor. The vendor will need to work with a representative of the Parks and Recreation Department to coordinate start times. 2. The contractor shall be responsible for all equipment and materials until the projects are completed. 3. The Sedalia Parks Department shall provide, pay for, and maintain approved, electrical power and water. Power shall be adequate to accommodate all necessary electrical construction equipment. 4. Storage ofmaterials may be accommodated within the project boundary in areas as approved and directed by a Parks & Recreation representative where they will be secured and out of the way. Contractor shall be responsible for all materials stored on site. 5. It is the Contractor's responsibility to erect a protective barrier around the construction site to prevent access by the public during times when the site is vacated by the construction crews. 6. The contractor and a representative from the Parks and Recreation Department shall meet on site to verify completion of the project.