Specifications include, but are not limited to: A. WORK “Work” includes all labor, materials, equipment, and services required of the CONTRACTOR, as shown, described, or inferred in the Contract Documents. The CONTRACTOR is only to use its forces and OWNER/CONSTRUCTION MANAGER-approved sub-trades to undertake the Work. The CONTRACTOR may not undertake further forces without the OWNER's prior written consent; such consent will be granted at the OWNER's discretion. B. WORK, LICENCES, PERMITS AND INSPECTIONS The CONTRACTOR agrees to do all work under the plans, specifications, and performance standards and, by good building practice, any civic, municipal, provincial, and federal laws and codes about it and to the OWNER's Satisfaction. The CONTRACTOR further agrees to obtain all licenses in connection with his work and inform the site OWNER/CONSTRUCTION MANAGER of the date and time work will be ready for inspection. C. GENERAL SITE MAINTENANCE 1. The CONTRACTOR shall clean up, remove, and dispose of all debris associated with this work in the bin provided by CONTRACTOR. Maintain cleanliness of the property at all times. 2. All work will be performed during regular working hours unless otherwise approved by OWNER/CONSTRUCTION MANAGER. 3. This document intends that all work performed by the CONTRACTOR is to be complete and functional in all respects, meeting all applicable codes and requirements and to the final approval of local governing authorities having jurisdiction. 4. The CONTRACTOR is responsible for protecting the work of other trades from any damage caused by his workforce. D. GENERAL RESPONSIBILITIES 1. The CONTRACTOR must familiarize himself with the site and identify potential problems before starting the job. 2. The awarding of this Contract shall be based on the assurance that adequate, qualified manpower will be provided to carry out this scope of work, and work will be commenced and completed as per the Project Schedule listed within. NOTE: This schedule may be revised from time to time by the Construction Manager. 3. The CONTRACTOR shall provide all necessary equipment and flagging personnel required for off-loading, handling, and distribution of the CONTRACTOR’s materials. 4. The CONTRACTOR shall provide additional labor for overtime and Saturday Work is required occasionally to comply with the Project Schedule at no additional cost to the OWNER. 5. The CONTRACTOR shall provide all temporary facilities for this work. Obtain permission from the CONSTRUCTION MANAGER before locating any temporary facilities on site. Erection of any sign on the site by the CONTRACTOR or its Sub-Contractors is not allowed without permission from The OWNER and CONSTRUCTION MANAGER. 6. The CONTRACTOR shall cooperate with other trades to ensure a smooth and safe workflow. Provide a plan detailing the sequencing of work to the CONSTRUCTION MANAGER. 7. The CONTRACTOR shall comply with all requirements for safety procedures, reports, and meetings in by applicable regulations, bylaws, and safety programs. 8. The CONTRACTOR agrees that the OWNER is not responsible for fire, theft, loss, or vandalism of any of the CONTRACTOR’s tools, equipment, materials, supplies, and work-in-progress. E. FRAMING 1. The CONTRACTOR shall supply all labor, supervision, tools, and equipment for the complete framing of the project. 2. The CONTRACTOR shall familiarize himself with the project's Mechanical and Electrical drawings if needed to appreciate the requirements of other trades concerning the project's framing. 3. The CONTRACTOR confirms that he is an expert in this field of work and is fully knowledgeable and experienced in all aspects of procedures, methods, regulations, codes, and municipal requirements. The CONTRACTOR further acknowledges that the OWNER is relying on this expertise. 4. The work shall include, but not necessarily be limited to, the following: a. The CONTRACTOR shall supply all labor for the complete framing and drywall. b. The CONTRACTOR shall supply a Forklift or manlift for all framing-related work, including all equipment for material handling and disposal. The OWNER shall provide the required power supply and hook-up. c. The CONTRACTOR shall supply all labor to frame walls. Studs will be on 16-inch centers. d. CONTRACTOR shall provide and install all dry-wall (5/8”). The drywall will be glued as well as screwed. e. The CONTRACTOR shall supply all hand nails, power nails, and screws required for the work. f. The CONTRACTOR shall schedule all work by and as directed by the PROJECT MANAGER. As time is of the essence, the schedule will be reviewed from time to time and is expected to be met; g. Weekly progress meetings will be expected and scheduled by the PROJECT MANAGER h. Project will consist of (3) areas listed below. This section is approximately 17 feet wide by 9 feet 8 inches tall. This area will require the installation of wood studs and sheetrock. This section is approximately 12 feet of wall and 19 feet in height. The area will be boxed to protect the roof drain and metal pillar. The wall will be to the deck using wood studs and sheetrock. This section is approximately 29 feet 9 inches wide. The area must be furred out to tie into the existing wall using wood studs and sheetrock. ***The contractor will finish all sheetrock.