A. Conduct a hazardous materials assessment to include a thorough project-design survey for asbestos, lead coatings, and other regulated & hazardous building materials that may be impacted by planned renovation activities. B. Assume collecting semi-destructive samples that may cause minor damage or blemishing of architetural finishes but will not damage existing mechanical or electronic equipment. Sampling shall not impact the structural integrity of the element being tested. C. Assume all electrical equipment to remain energized and not to be sampled. All equipment in the electrical room is to remain. Panels in the barn to be consolidated to one central power source. Visual assessment of panels in the barn is required.