1. The Work includes installing new acoustical ceilings, gypsum board soffits, and interior paint. 2. The Work includes installing new refrigerant based make-up air unit with natural gas heat. 3. The Work includes replacing exhaust fans and adding HEPA filter boxes. 4. The Work includes installing ceiling mounted fan filter units. 5. The Work includes replacing 4-pipe fan coil units, associated duct, and hydronic pipe specialties. 6. The Work includes integrating new HVAC equipment into the existing Building Automation System. 7. The Work includes removing power to all HVAC equipment and electrical devices in the area of construction. 8. The Work includes providing power to new fan coils, exhaust fans, fan filter units, and make-up air unit. 9. The Work includes temporarily removing power to ceiling devices in area of construction including but not limited to: lights, fire detection, and Wi-Fi access points to allow for construction of new soffit area for new fan filter units. 10. The Work includes replacing the ceiling electrical devices in the new acoustical ceilings and extending any and all wire and conduit for lights to the new outside wall of the created soffit. 11. The Work includes providing any and all low voltage conduit for HVAC systems and all required circuit breakers.