Specifications include, but are not limited to: statements of qualifications and experience from qualified consultants for airfield engineering and development projects at Kirksville Regional Airport. The selected consultant will provide services for the next 5 years. Projects may be subject to future receipt of Federal funding under the Federal Aviation Administration (FAA) Airport Improvement Program, as administered by the Missouri Department of Transportation (MoDOT) through the State Block Grant Program (SBGP). These projects may include the following: 1. Airport terminal improvements/rebuild. Estimated cost $2,500,000 2. Airport hangar rehabilitation. Estimated cost $332,000. 3. Acquire snow removal equipment. Estimated cost 350,000. The required services include but are not limited to, engineering services for preliminary, design, bidding, and construction phases and incidental special services including geotechnical, preparing categorical exclusion documentation, as-built ALP updates, and surveying. The consultant should provide the name(s) of the preferred firm(s) for any work which is likely to be sub-consulted. Sub-consultant changes can occur with Sponsor approval. At the Sponsor’s discretion, this selection can be retained for projects initiated within five years or until all projects are complete. Projects other than those listed above will require a new solicitation except as allowed in FAA Advisory Circular 150/5100-14 paragraph 2.7.2 (4). Disclosure: Under a previous agreement, Jviation assisted the Sponsor with the preparation of their CIP and the above cost estimates. A qualification-based selection process conforming to FAA Advisory Circular 150/5100-14 will be utilized to select the most qualified firm. Selection criteria will include: • Recent experience in airport projects