The Bidder agrees to furnish all labor, materials, tools, and equipment required to replace existing 208Y/120V service entrance switchboard and distribution section with a new remote operated main breaker ‘SEP1’ to be located in the basement with a separate distribution switchboard MDP to be located in the roof mechanical room. A second remote operated main breaker ‘SEP2’ to be provided for “future”. Panels ‘EL’ and ‘RL1’ are to be replaced with new. All existing loads to be reconnected. New door is to be provided in the new basement electrical room; all as indicated on the Drawings and described in these Specifications; Additive Alternate No. 1: Replace ceiling in Growth Chamber 3-25 and removal of abandoned DX/FCU’s in Growth Chamber 3-25 as noted in construction documents.