Specifications include, but are not limited to: The repair and seal coat of the Activity Center parking lots located in Moberly, Missouri. 1. Protect existing site improvements to remain including curbs, pavement, and utilities. 2. Maintain access for fire-fighting equipment and access to fire hydrants. 3. Parking: Use designated areas of Owner's existing parking areas for construction personnel. 4. Dewatering Facilities and Drains: Comply with requirements of authorities having jurisdiction. Maintain Project site, excavations, and construction free of water. Dispose of rainwater in a lawful manner that will not result in flooding Project or adjoining properties nor endanger permanent Work or temporary facilities. Remove snow and ice as required to minimize accumulations.