This RFQ is to provide Design-Build Services for design, construction, and commissioning of the following scope of work, including but not limited to: • 15kV primary automatic transfer switchgear in three separate buses – a generator tie bus located between two independent utility distribution buses. • Two 500kVA, 13.2kV/480V three-phase pad transformers. • Two 3000kVA, 13.2kV/480V three-phase pad transformers. • Utility coordination to assist Evergy with service upgrade requirements. • Sitework improvements to connect new power equipment to existing distribution conduit and switchgear. • Design of a facility backup generation system. Installation of generator pads, duct banks to MV switchgear, generator controls and protection inside the MV switchgear and all other generator accessories to enable seamless cutover to future generators (to be procured and installed by others). • Work planning and sequencing to test and commission new primary switchgear and cut site power over to new equipment without site process disruption. • Demolition of existing power pen facilities. • Updated SKM Model, including ArcFlash Study for the Power Pen with focus on reasonable incident energy considerations.