The scope of this project is to remove and replace thirteen overhead doors, and to remove and replace hoist operators for three (3) of the new overhead mechanics bay doors at the Hazelwood Maintenance Garage located at 115 Ford Lane, Hazelwood, MO 63042. Unless otherwise specifically stated in the Contract documents and technical specifications, the Contractor shall provide and pay for all bonds, insurance, permits, inspections, licenses, materials, labor, tools, equipment, light, power, water, heat, transportation, testing, supervision, utility connection fees and other facilities necessary for the execution and completion of work. If the Contractor, in the course of work, finds any discrepancy between the specifications and physical conditions of the locality, or any error or omission in the specifications, shall immediately inform the Community Development Coordinator, in writing, and the Community Development Coordinator shall promptly verify the same. The Contractor shall deliver all improvements embraced in this Contract, complete in every respect, within the specified time. The Contractor shall at all times carry on the work in such a manner as to minimize the interference with traffic, utility and municipal services, and adjoining property owners’, egress, ingress and use of their property. The work shall be carried out in such a manner that all physical structures and natural features are restored to at least as good of condition as they were in before the work was done. It is understood that where specifications apply, their provisions shall determine the character and manner of restoration of existing structures and features. The Contractor shall repair any damage, outside of the scope of work, done to private or public property to the satisfaction of the Owner of said property and the Contractor thereof shall absorb the cost