The project scope includes a new connection from Calvary Church Road to Castle Acres Rd. This connection will consist of a 26-30 foot wide, 10.5-inch-thick asphalt pavement section. There will also be a 235 foot three-span bridge with prestressed concrete girders across Plattin Creek tributary. Other scope of work includes, but is not limited to, bulk earthwork (cut/fill/grading), storm water improvements, permanent traffic control guardrail. Work shall be in accordance with the provided Specifications, Job Special Provisions, and Plans. Where not specifically covered by the Specifications, or Job Special Provisions or Plans, the Contractor shall adhere to the currently effective 2025 Edition of the “Missouri Standard Specifications for Highway Construction,” and the currently effective “MoDOT Standard Plans for Highway Construction.” The contractor shall have a maximum of One Hundred Thirty (130) Working Days or a completion date of September 15th, 2026, or whichever comes first, to complete the project.