Specifications include, but are not limited to: The project consists of improvements to both the Wastewater Treatment Facility (WWTF) and the Gravity Sewer Collection System. Improvements to the WWTF include the construction of the following: Lagoon Floating Baffle Site Earthwork 10” & 12” Ductile & PVC Yard Piping Effluent Flow Monitoring Chlorination/De-chlorination Basins Chlorination/De-chlorination Equipment Post Treatment Aeration Cascade Reconstruct the Catwalk to Existing Outlet Structure Improvements to the Gravity Sewer Collection System include the approximate quantities: Seeding & Mulching – 965 LF Select Borrow Material – 91 CY Crushed Stone – 41 CY Concrete Resurfacing – 5 SY Bituminous Resurfacing – 37 SY Sewer Line Television Inspection – 1,370 LF Sewer Line Cleaning – 980 LF 8” Pipe Bursting & Appurtenances – 230 LF 8” CIPP Lining – 170 LF 48” Manholes – 3 Each 8” Point Repairs – 4 Each 8” Gravity Sewer Line Replacement – 700 LF 8”x 4”or 6” PVC Wye or Tee – 18 Each 4” PVC Cleanout – 20 Each 4” PVC Service Line – 280 LF Connection to Existing Service - 18