Specifications include, but are not limited to: Tower Modifications Scope – Base Bid #1 W45AA Displacement Facilities – The Contractor shall perform all the work specified in Appendix A1. 1. Appendix A1, Sheet No. xxx, includes a table titled Modification Schedule with a list (Items 1 through xx) of the basic requirements. Note: To be provided via Addendum no later than 8/1/2020. 2. Note the requirement to contract with TEP for inspections, the costs of which will be paid by MPB. 3. Include removal of existing antenna and installation of new antenna. The antenna and all materials will be provided by MPB through the Antenna Contractor. 4. Include removal of unneeded items and disposal of all removed items and materials. The decision whether an item is unneeded rests with the Owner’s representative