Specifications include, but are not limited to: MOBILIZATION Lump Sum LS CLEARING AND GRUBBING Lump Sum LS REMOVAL OF BRIDGE @ STA. 17+65 1.000 UN REMOVAL OF EXISTING ASPHALT PAVEMENT (ALL DEPTHS) 89.000 SY BORROW EXCAVATION (LVM) (CONT. FURNISHED) (CLASS 9) 500.000 CY EXCESS EXCAVATION (FM) 82.000 CY CRUSHED STONE 290.000 TON MIXING, SHAPING, AND COMPACTION 126.000 SY HOT MIX ASPHALT, ST, 9.5MM 242.000 TON GUARD RAIL, "W" BEAM 100.000 LF GUARD RAIL, BRIDGE END SECTION, TYPE "I" THRIE BEAM 4.000 EA GUARD RAIL, TERMINAL END SECTION 4.000 EA ROADWAY CONSTRUCTION SURVEYING Lump Sum LS BRIDGE CONSTRUCTION SURVEYING Lump Sum LS MAINTENANCE OF TRAFFIC Lump Sum LS ADDITIONAL CONSTRUCTION SIGNS 0.000 SF 4" WIDE THERMOPLASTIC EDGE STRIPE (CONT. WHITE) (90 MILS) ; 4" WIDE THERMOPLASTIC TRAFFIC STRIPE (SKIP YELLOW) (120 MILS) 0.085 MI TWO-WAY YELLOW REFLECTIVE HIGH PERFORMANCE RAISED MARKERS.