Specifications include, but are not limited to: Limits of the project include approximately 1,450 linear feet on South Street (Segment 2) from State Street to Town Creek Bridge. Preplanning through the Construction Document Phase of repairs or replacement of sidewalks, driveway aprons and curbs/gutters; install ADA improvements at intersections, repairs or replacement of utilities and drainage systems (as determined by engineering investigation); pavement repairs; milling and asphalt overlay, and pavement striping to match existing. Engineering design will include investigation of utilities to determine the need for water and sewer rehabilitation/replacement. As all infrastructure belongs to the City of Jackson, professionals will be required to coordinate all work with the City of Jackson and JXN Water Inc.