Specifications include, but are not limited to: Mobilization 1 LS Clearing & Grubbing 1 LS Hot Mix Asphalt, ST, 9.5-19.0mm 680 Ton Crushed Limestone 961 CuYd Clay Gravel (LVM) 161 CuYd Geotextile Fabric Stabilization (Type V) (AOS < 0.43) 1,333 SqYd Unclassified Excavation (PM) 84,000 CuYd Borrow Material (PM) 40,000 CuYd Removal of Pipe 50 LinFt 24-36" Reinforced Concrete Pipe Class III 280 LinFt 28"x 18" & 43”x26” Reinforced Concrete Arch Pipe, Class III 88 LinFt 24"-36” Reinforced Concrete End Section 6 Each 28" x 18" & 43”x26” Reinforced Concrete Arch End Section 4 Each 6" PVC SCH 40 325 LinFt Structural Concrete, Minor Structures 1.1 CuYd 6" Perforated Pipe 1,380 LinFt Maintenance of Traffic 1 LS Reflectorized Traffic Warning-Regulatory Signs (Encapsulated Lens) 4 Each 4" Thermoplastic Edge Stripe (Continuous White) (60 mil minimum) 0.267 Mile 4" Thermoplastic Traffic Stripe (Continuous Yellow) (90 mil minimum) 1,800 LinFt Two-Way Yellow Reflectors High Performance 10 Each Agricultural Limestone 20 Tons Commercial Fertilizer (13-13-13) 10 Tons Ammonium Nitrate 3 Tons Seeding 10 Acres Vegetative Material for Mulch 30 Tons Solid Sodding 500 SqYd 20" Wattles 400 LinFt Temporary Silt Fence 2,500 LinFt Loose Riprap (200 lb.) 30 Ton