Specifications include, but are not limited to: MOBILIZATION LUMP SUM LS CLEARING AND GRUBBING LUMP SUM LS REMOVAL OF BRIDGE (STA. 13+31) 1.000 UN REMOVAL OF ASPHALT PAVEMENT 4,894.000 SY UNCLASSIFIED EXCAVATION (FM) 3,168.000 CY BORROW EXCAVATION (F.M.E.) 33,938.000 CY (CONTRACTOR FURNISHED) (CLASS 4) CRUSHED STONE 2,500.00 TON HOT MIX ASPHALT, (ST) (12.5 MM) 538.000 TON HOT MIX ASPHALT, (ST) (19.0 MM) 1,123.000 TON GUARD RAIL, W-BEAM 275.000 LF GUARD RAIL, BRIDGE END SECTION, 4.000 EA TYPE "I" THRIE-BEAM GUARD RAIL, TERMINAL END SECTION 4.000 EA RIGHT-OF-WAY MARKERS (TYPE I) 16.000 EA MAINTENANCE OF TRAFFIC LUMP SUM LS ADDITIONAL CONSTRUCTION SIGNS 0.000 SF 4" WIDE THERMOPLASTIC EDGE STRIPE 0.771 MI (CONTINUOUS WHITE) (90 MILS) 4" WIDE THERMOPLASTIC TRAFFIC 0.211 MI STRIPE (SKIP YELLOW) (90 MILS) 411 WIDE THERMOPLASTIC TRAFFIC STRIPE (CONTINUOUS YELLOW) (90 MILS) TWO-WAY YELLOW REFLECTIVE HIGH 51.000 EA PERFORMANCE RAISED MARKERS REFLECTORIZED TRAFFIC OBJECT MARKER 4.000 EA (ENCAPSULATED LENS) (TYPE 3) EROSION CONTROL ITEMS: AGRICULTURAL LIMESTONE COMMERCIAL FERTILIZER (13-13-13) 5.500 TON AMMONIUM NITRATE 0.500 TON SEEDING 5.500 AC AC VEGETATIVE MATERIALS FOR MULCH 11,000 TON TEMPORARY SILT FENCE 6,440.000 LF (TYPE I OR II) (ACTS 0.15-0.84) LOOSE RIPRAP, 300 LB. 50.000 TON WATTLES (20") 900.000 LF BRIDGE ITEMS: TEST PILE 2.000 EA CONVENTIONAL STATIC PILE LOAD TEST 0.000 EA 14" PRESTRESSED CONCRETE PILING 2,07 0.000 LF BRIDGE CONCRETE, CLASS "A" 197,680 CY 40' PRESTRESSED CONCRETE BEAM 397,500 LF TYPE 1+2 80' PRESTRESSED CONCRETE BEAM 398.750 LF TYPE III REINFORCEMENT 34,988.000 LB CONCRETE RAILING 320.000 LF LOOSE RIPRAP, 300 LB. 1,700.000 TON GEOTEXTILE UNDER RIPRAP, 1,400.000 SY TYPE V, AOS 0.21-0,43