Specifications include, but are not limited to: The Project consists of one (1) wastewater pump-station rehabilitation: removing and salvaging all submersible pumps/motors, guide rails, discharge piping, valve pit piping and valves, and all incidentals; cleaning and lining the concrete wet well; provide and install new submersible pumps/motors, guide rails, discharge piping, valve pit piping and valves, and all incidentals including providing and maintain temporary by-pass pumping operations; removing and salvaging all control panels (excluding SCADA equipment), providing and installing new controls and control panel; removing existing roof and supporting structure at pump station and replace with new roof, supporting structure, and light fixtures; relocation of existing power service from abandoned pump station building to existing pump station; installation and re-route of gravity influent to pump stating including all sanitary-sewer piping, manholes, and incidentals; installation of new force main from pump station to existing force-main discharge at lagoon; installation of combination air release/vacuum valves; removal of existing fences; installation of chain-link fence and gates; and installation of rock/gravel at pump station.