Work under this section consists of furnishing all materials, labor, and equipment required for the installation of cured-in-place pipe (CIPP) in storm drains cured by ultraviolet (UV) light. 1) CONTRACTOR FOR VERIFYING ALL PIPE DIAMETERS AND LENGTHS. 2) ALL DRAINAGE PIPES ARE HDPE. 3) PIPE CLEANING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 4) ANY CONFLICTS FOUND DURING THE CLEANING OF THE PIPE, INCLUDING BUT NOT LIMITED TO UTILITY CASINGS, CONDUITS AND WIRES, THE CONTRACTOR MUST NOTIFY THE COUNTY IMMEDIATELY 5) ANY REMOVAL OR MODIFICATIONS TO INLET TOPS OR BASINS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND COORDINATED WITH THE COUNTY. 6 ALL INLETS REMOVED, MODIFIED OR ALTERED BY THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR AND APPROVED BY THE COUNTY. 7) ACCESS TO ANY JUNCTION BOXES WITHOUT DIRECT ACCESS SHALL BE COORDINATED WITH THE COUNTY. 8) PORTABLE RESTROOM FACILITIES ARE REQUIRED AND SHALL BE PLACED IN A LOCATION DETERMINED BY THE COUNTY. 9) MATERIAL AND EQUIPMENT STORAGE SHALL BE IN A LOCATION APPROVED BY THE