• Install sluice and all components included (water pumps included) on project site • Dispose of any remaining waste and debris from installation • Prices should be itemized to show cost of installation separate from sluice and water pumps. • Response time for service calls should be stated in bid and how service calls are addressed / process for reporting trouble with equipment • Bid should include price breakdown to replace broken, damaged or stolen equipment (water pumps, paneling, tower etc.) • Delivery and installation timeline should be included Sluice shall be at least Sixty- Five feet in length. Shall be built using 14-gauge stainless steel Shall have lumber treated to a high standard (UCB4 “critical structure") for freshwater submersion Shall include dual water systems to ensure that water flowing through the tower remains clean at all times Sluice panning section shall be designed to wash away used sand automatically, allowing the unit to operate independently without requiring manual cleaning after each use. Sluice Capacity shall be approximately 400-500 3lb bags or equivalent throughout an eight-hour period. Shall feature an additional 13.5 feet of cascading waterfalls and a 15-foot-tall tower Waterfall shall Include five "stepped" waterfall system for increased visual exposure and appeal over a singleloop or slide-style single loop systems.