Amendment 1: RFIs answer
1. Would it be acceptable to include secure links (photos or short videos) to our past performance, such as Google Drive or YouTube/Vimeo links? The Government will not accept and google drive or YouTube/Vimeo links.
2. Will a Q&A summary be issued after the June 20th deadline for vendor questions? No questions will be accept after the June 20 deadline. Any question ask before the deadline will be answer and posted to this solicitation as an RFI answer amendment.
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
The contractor is responsible for: providing all material, equipment and transportation required for the purchase and delivery of one vertical pool pump located at Columbus AFB, MS. Unit is required to be a Speck, BADU Block Multi series Vertical Pump [model 100/250, a nominal flow rate of 562g.p.m., max flow rate of 800g.p.m., a nominal head of 70 ft., rated at 460V, 3 phase] or approved government equal. Current pump is 15 HP, 1740 RPM, 230/460 V, 3 phase with a design flow of 562 GPM and 70’ head. All suction and discharge piping is sch. 80 PVC. The pool pump material must be alloy.
This requirement is for the delivery of the pool pump and motor only.
Any questions pertaining to this item are due by June 23, 2025 at 12:00 pm CST.