1. The Contractor shall erect and maintain construction signing, provide all signs, and traffic handling devices in accordance with the Traffic Control Plan. The costs for this work are to be included in the price bid for pay item 907-618-A: Maintenance of Traffic. All traffic control devices on this project should comply with the latest version of the MUTCD. Fluorescent orange sheeting shall be used on all construction and traffic control signs except for those designated in the plans to be black legend and border on white background. The Contractor will be required to use 42-inch channelizer cones with 6-inch-wide reflective tape and 16-pound vertical panel bases for each cone. 2. The Contractor shall place thermoplastic audible stripe on the edge of pavement, and thermoplastic stripe on the centerline of SR 433. Raised pavement markers are to be placed at 80-foot intervals in tangents, and 40-foot intervals in curves & urban sections along the centerline and the edge line. Due to the narrow lane width, the edge line markers are to be installed inside the white edge stripe as directed by the Engineer.