The purpose of this amendment is to answer the following questions received and to extend the response date. The response date for this solicitation is now Friday May 6, 2022 at 11am CST. This amendment also adds the attached drawing to this solicitation. 1. Would the Government be open to upgrading their P2000 system to a newer more efficient system that would be able to fulfill the required specifications within the SOW? Upgrading the P2000 system is not within the scope of this contract 2. Would the Government please confirm that they are not requiring Clin 0004, Clin 0005, and Clin 0006? As per the statement of work section 2.5 Due to the difficulty in finding end of life equipment, SLVHCS will provide the P2000 cabinet, RDR8, CK721 controller and the power supply. These items no longer need to be supplied by the contractor. They will be available to the contractor upon installation. The rest of the scope of work remains unchanged. CLINS 0004 (access control hardware), 0005 (P2000 cabinet with RDR8), and 0006 (power supplies) are not required. 3. What is the total length of the cable to be installed, and is there is any additional information regarding the cable itself? The longest run from the LVSR closet to the farthest door is 600 feet. Banana cable is needed. See floor plan attached.