Specifications include, but are not limited to: Removal of Asphalt Pavement, All Depths Removal of Asphalt Pavement, Failed Areas Removal of Cement Treated Base, All Depths Removal of Concrete Pavement w/ Variable Depth Overlay Removal of Guard Rail Bridge End Section Removal of Guard Rail Cable Anchor, Including Post, Rail, Anchor & Hardware Removal of Guard Rail, Including Rails, Posts and Terminal Ends Removal of Island Pavement, All Types Removal of Traffic Stripe Excess Excavation, FM, AH Geotextile Stabilization, Type V, Non-Woven Solid Sodding Concrete Paved Ditch Granular Material, LVM, Class 5, Group C Open Graded Friction Course, 9.5-mm Mixture Bituminous Tack Coat 12.5-mm, HT, Asphalt Pavement 19-mm, HT, Asphalt Pavement 19-mm, ST, Asphalt Pavement 9.5-mm, HT, Asphalt Pavement