The purpose of this project is to implement improvements to the equipment in the weight room spaces at N.R. Burger Middle School and STEAM Academy in accordance with the specifications listed below: a. Rack system: Williams Strength or equivalent i.Provide and install four 8 Post Full/Half Rack Combo Includes 2 Multi Grip Pull up Bars. ii.Provide and install eight 2- layer laser logos for rack arches. iii.Provide and install four Chrome Band Pegs. iv.Provide and install twenty-four Weight Storage 12" pegs with UHMW protection. v.Provide and install sixteen Weight Storage 6" pegs with UHMW protection. vi.Provide and install four 0/90 Bench with Spotter Steps, wheels, and special grip pad. vii.Provide and install four Bench logos on head and gusset. b. Bars: Midwest Power Bar or equivalent i.Provide and install eight Midwest Power Bar with needle bearings black. ii.Provide and install four Midwest Power Bar with needle bearings silver. iii.Provide and install four Hex Bar Chrome Finish. iv.Provide and install eight Tsunami Bar Speed. v.Provide and install eight Multi Stiks. c. Logo Plates and Power Block Dumbbells i.Provide and install fifty 45lb Prime Black Competition Bumper Plates with Logo. ii.Provide and install thirty-two 25lb Prime Black Competition Bumper Plates with Logo. iii.Provide and install forty 10lb Urethane Black Bumper Plates with Logo. iv.Provide and install thirty-two 5lb Black Rubber change Plates with Logo. v.Provide and install sixteen 2.5lb Black Rubber change Plates with Logo. vi.Provide and install one Dumbbell set 5-50 with logo. vii.Provide and install one Dumbbell set 5-75 with logo...