MOBILIZATION 1.000 LS CLEARING AND GRUBBING 1.000 LS REMOVAL OF PRECAST BRIDGE @ STATION 19+56.44 1.000 UN REMOVAL OF ASPHALT PAVEMENT (ALL DEPTHS) 2,981.000 SY UNCLASSIFIED EXCAVATION (PM) 1,627.000 CY CHANNEL EXCAVATION (FM) 290.000 CY EXCESS EXCAVATION (FM) 7,811.000 CY GRANULAR MATERIAL, (CLASS 5, GROUP C) 1,120.000 TON CRUSHED STONE 801.000 TON COLD MILLING OF BITUMINOUS PAVEMENT, ALL DEPTHS 250.000 SY 18" REINFORCED CONCRETE PIPE, CLASS III 32.000 LF GUARD RAIL, "W" BEAM, COMPLETE IN PLACE 250.000 LF GUARD RAIL, BRIDGE END SECTION, TYPE "I" THRIE BEAM, COMPLETE IN PLACE 4.000 EA GUARD RAIL, TERMINAL END SECTION 4.000 EA CONSTRUCTION SURVEYING 1.000 LS BRIDGE CONSTRUCTION SURVEYING 1.000 LS RIGHT-OF-WAY MARKERS (TYPE II) 5.000 EA MAINTENANCE OF TRAFFIC 1.000 LS ADDITIONAL CONSTRUCTION SIGNS 0.000 SF REFLECTORIZED TRAFFIC OBJECT MARKER (ENCAPSULATED LENS) (TYPE 3) 4.000 EA GEOTEXTILE UNDER BRIDGE END TREATMENT, TYPE V, NON-WOVEN (AOS<0.43) 68.000 SY